Rail dates

Contents:

(click a title below to go direct to that section)
Consultations
Franchising
Network Rail Control Period 6 planning
Publications
Route improvement works
Various

Consultations

Image
1 March 2020. Sunday. Close of Network Rail's consultation on revised proposals to protect Dawlish-Teignmouth line.

Image
2 March 2020. Monday. Close of Network Rail's preliminary consultation on proposals for Cambridge South station.

Image
23 March 2020. Monday. Close of Mole Valley District Council's consultation on Future Mole Valley, the draft Local Plan 2018-33.

Image
30 March 2020. Monday. Close of Hertfordshire County Council's consultation on County Rail Strategy.

Image
6 April 2020. Monday. Close of Network Rail's consultation on Reigate station upgrade.

Image
19 April 2020. Sunday. Close of DfT's consultation on closure of Newhaven Marine station.

Image
1 December 2020. Tuesday. Close of Homes England's consultation on proposal to develop land west of Ifield, West Sussex for new homes along with roads, schools and other community infrastructure.

Franchising

Image
See latest Rail Franchise Schedule update 1 July 2019, previously 20 July 2017.

Summary of current re-franchising

South Eastern new franchise - was planned from 1 April 2019 - Invitation To Tender issued to the short-listed bidders, for their Best and Final Offers by 14 March. New franchise contract award, expected November 2018, deferred during Westminster Hall debate on 27 November by new Rail Minister Andrew Jones MP to early-2019, confirmed in December 2018 as extension of Direct Award to 22 June 2019. In Written Statement on 10 April 2019 Transport Secretary Grayling confirms further short-term extension to 10 November 2019, with option until April 2020. In August 2019 came confirmation that the franchise continues to April 2020. More info: Better journeys for SE rail passengers and Stakeholder briefing document. See also Prospectus.
Great Western new franchise - consultation 29 November 2017 - 21 February 2018. Submission of Passport Application/Pre-Qualification Questionnaire for non-passport holders due June 2018. Expressions of Interest invited from bidders. Stakeholder Briefing Document, and Government response to consultation concluded February 2018 published 28 August 2018. New Direct Award expected to 2022.
Cross Country new franchise - was due from February 2020 - franchise consultation launched on 7 June, until 30 August 2018. Prospectus launched on 6 July, re-issued 20 September 2018. Submission of Passport Application/Pre-Qualification Questionnaire for non-passport holders; potential bidders invited to submit Expressions of Interest issued on 6 July, re-issued 20 September 2018. Invitation To Tender was due to be issued 24 January 2019 for return in April, followed by contract award in October 2019 for February 2020 start of new franchise. STOP PRESS: refranchising halted 20 September 2018, pending rail review.

November 2019

~ Thameslink, Southern and Great Northern new franchise/s - submission of Passport Application/Pre-Qualification Questionnaire for non-passport holders would have been expected.

December 2019

Great Western new franchise award would have been expected. New Direct Award to 2022 now expected.

Image > Image Image
8 December 2019. Sunday. Virgin Trains West Coast franchise ended; West Coast Rail: West Coast Partnership new First/Trenitalia franchise commenced.

February 2020

~ Arriva CrossCountry Direct Award due to end (extension by 4 additional reporting periods from October 2019, further 9 additional reporting periods extension available at Transport Secretary's discretion). STOP PRESS: refranchising halted 20 September 2018, pending rail review.
~ Thameslink, Southern and Great Northern new franchise - notice would have been expected in the Official Journal of the European Union/Expressions of Interest invited from bidders.
~ Chiltern new franchise - submission of Passport Application/Pre-Qualification Questionnaire for non-passport holders would have been expected.

March

Image
1 March 2020. Sunday. Northern Trains Ltd, subsidiary of DfT OLR Holdings Ltd, begins operation of former Northern franchise.

April

Image
Great Western Railway Direct Award due to end (13 additional 'reporting periods' extension assumed) but may be replaced by new Direct Award to 2022; Great Western new franchise was due to commence.
Image
Southeastern franchise due to end. See SE.

May

Chiltern new franchise - notice would have been expected in the Official Journal of the European Union/Expressions of Interest invited from bidders.

July

Thameslink, Southern and Great Northern new franchise - Invitation To Tender would have been expected to be issued to short-listed bidders.

October 2020

Chiltern new franchise - Invitation To Tender would have been expected to be issued to short-listed bidders.

May 2021

New Thameslink, Southern and Great Northern - new franchise operator/s would have been due to be announced.

June

TransPennine Express new franchise - submission of Passport Application/Pre-Qualification Questionnaire for non-passport holders would have been expected.

August

Chiltern new franchise - contract award would have been expected.

September

Image
~ Govia Thameslink Railway management contract due to end (eligible for up to 26 additional 'reporting periods' extension)
~ TransPennine Express new franchise - notice would have been expected in the Official Journal of the European Union/Expressions of Interest invited from bidders.

December 2021

Image
Chiltern Railways franchise due to end (eligible for up to 7 additional 'reporting periods' extension); Chiltern new franchise would have been due to commence.

February 2022

TransPennine Express new franchise - Invitation To Tender would have been expected to be issued to short-listed bidders.

March

Image Image
ScotRail franchise now due to end. See Transport Scotland

April

Image
ScotRail franchise had been due to end (was eligible for up to three years extension)

October

South Western new franchise - submission of Passport Application/Pre-Qualification Questionnaire for non-passport holders would have been expected.

December 2022

New TransPennine Express franchise operator would have been due to be announced.

2023

Image
Access rights for Heathrow Express to London Heathrow Airport Terminals 2/3 and 5 due to expire. 

January

South Western new franchise - Expressions of Interest would have been expected to be invited from bidders.

April

Image
TransPennine Express franchise due to end (eligible for up to 26 additional 'reporting periods' extension)

May

Image
Transport for London 8-year concession for MTR Elizabeth line (potential for 2-year extension) due to end/start of next concession expected.

June

~ South Western new franchise Invitation To Tender would have been expected.

December 2023

East Anglia new franchise - submission of Passport Application/Pre-Qualification Questionnaire for non-passport holders would have been expected.

March

East Anglia new franchise - Expressions of Interest would have been expected to be invited from bidders.

April

South Western new franchise award would have been expected.

May

Image Image
Transport for London 7.5-year concession for London Overground (potential for 2-year extension) due to end/start of next concession expected.

August


Image
~ First/MTR South Western franchise due to expire (up to 11 additional reporting periods available at Secretary of State's discretion), new South Western franchise would have been due to commence.
~ East Anglia new franchise - Invitation To Tender would have been expected.

May

Image
Latest possible end/start of Transport for London Elizabeth line operating concession.

June

New East Anglia franchise operator would have been due to be announced.

October 2025

Image
Greater Anglia franchise due to end (eligible for up to 13 additional 'reporting periods' extension at Secretary of State's discretion), new East Anglia franchise would have been due to commence.

April 2026

Image
1 April 2026. West Midlands Trains franchise due to end (subject to option for extension of up to 2 years.)

May 2026

Image
Latest possible end/start of Transport for London operating concession for London Overground.

August 2027

Image
21 August 2027. East Midlands Railway franchise due to end (subject to option for extension of up to 2 years.)

2028

Image
Merseyrail concession due for renewal.

November 2029

Image
Essex Thameside franchise due to end (eligible for up to 7 additional 'reporting periods' extension at Secretary of State's discretion)

March 2030

Image
Caledonian Sleeper franchise due to end.

December 2031

Image Image
First/Trenitalia West Coast Partnership due to end.

October 2033

2nd version
Wales & Borders and new South Wales Metro franchise due to end.

Network Rail Control Period 6 planning

Image Image Image
Rail infrastructure investment planning for 2019-24, Control Period 6.
~ ORR issued February 2017 advice to DfT on HLOS and SoFA for Control Period 6 2019-24 (CP6).
~ ORR issued February 2017 guidance to Network Rail on strategic business plans (SBPs) company will produce for CP6 in December 2017.
~ Rail Delivery Group published February 2017 Initial Industry Advice for Control Period 6 (2019-24) to Scottish government and ORR.
~ ORR published April 2017 advice to Transport Scotland on maintenance and renewals expenditure in CP6.
~ ORR published June 2017 conclusions notes on working papers on the outputs framework (WP4) and a close-out report on the enhancements framework (WP5).
~ ORR updates (if necessary) guidance to Network Rail on its strategic business plans, following the DfT's July 2017 High Level Output Specification (HLOS) and initial Statement of Funds Available (SoFA) for CP6, and October 2017 final SoFA.
~ ORR published July 2017 letters to DfT and to Transport Scotland outlining next steps on the HLOS and SoFA process.
~ DfT published July 2017 Guidance to the ORR.
~ ORR issued July 2017 consultation on overall framework for regulating Network Rail - closed 21 September.
~ ORR issued July 2017 Supplementary guidance on Network Rail’s strategic business plan and planning assumptions for England & Wales for CP6.
~ ORR published September 2017 consultation relating to charges and contractual incentives, following June's conclusions from December 2016's consultation.
~ DfT published October 2017 final SoFA for CP6 2019-24; Network Rail's response.
~ Network Rail December 2017 submitted its route and other strategic plans to ORR.
~ ORR published December 2017 an open letter following the January 2017 consultation on the financial framework for PR18.
~ ORR published January 2018 conclusions following July 2017 consultation on the proposed framework for regulating Network Rail’s routes and national system operator (NSO), including incentives and NSO outputs.
~ ORR consultation closed on 18 January 2018 on financial framework for PR18.
~ ORR consultation closed on 25 January 2018 on Working paper 6 The volume incentive and Working paper 7 Collaborative working on the rail network.
~ Network Rail on 9 February 2018 submitted its finalised strategic business plans to ORR (including any updates to the versions provided to ORR on 8 December 2017)
~ Network Rail on 13 February published its Strategic Business Plans. ORR consultation until 6 March.
~ Following on from financial framework for PR18 open letter update in December 2017, after January 2017 consultation, ORR seeks views in early-March 2018 on ‘minded to’ decisions on financial framework issues; consultation closed 27 April.
~ ORR consults on its draft determination for CP6 from 12 June to 31 August 2018. Response from Network Rail, and from the DfT on 23 August.
~ ORR published its final determinations on Network Rail's Strategic Business Plans for Control Period 6 (2019-24) on 31 October for England & Wales and for Scotland.
~ ORR publishes 'Managing Change' Policy on 16 November 2018.
~ ORR consults on Implementing infrastructure cost charges for open access operators. See Future for Open Access.
~ ORR consults on draft Guidance on the Economic Equilibrium Test (for open access operators).
~ More info: Periodic Review 2018 (PR18) timetable and process - V2.0, October 2018.

February 2019


Image
7 February 2019. Thursday. Final date by which Network Rail decides whether to accept or reject ORR's Final Determination for CP6. More info: Network Rail confirms 'green light' for next 5-year funding package and spending plan and Periodic Review 2018 (PR18) timetable and process - V2.0, October 2018.

March


Image
Latest month in which ORR publishes Network Rail’s revised network licence following completion of statutory consultation, confirms and publishes enforcement policy for CP6, and publishes final version of document ‘Enhancements in control period 6: Roles and responsibilities’. More info: Periodic Review 2018 (PR18) timetable and process - V2.0, October 2018

Image
15 March 2019. Friday. Latest date by which ORR issues ‘review implementation notices’, confirming that the review will be implemented on 1 April 2019. More info: Periodic Review 2018 (PR18) timetable and process - V2.0, October 2018

Image
31 March 2019. Delivery Plan for Control Period 6 (2019-24) published by this date. More info: Periodic Review 2018 (PR18) timetable and process - V2.0, October 2018

April


Image
1 April 2019. Monday. Control Period 6 (2019-24) started. Changes to train operators’ access contracts, including new access charges, and Network Rail’s network licence, took effect.

Publications

January

Image
14 January 2020. Tuesday. Estimates of station usage for 2018/19 published. More info: ORR

Image
28 January 2020. Tuesday. National Rail Passenger Survey, Autumn 2019 results published. More info: TF-NRPS

February

Image
20 February 2020. Thursday. Passenger rail performance Q3 2019/20 (October-December) published - PPM, CaSL, FDM. More info: ORR

March

Regional rail usage for 2018/19. More info: ORR.
5 March 2020. Thursday. Freight rail usage and performance Q3 2019/20 (October-December) published - freight moved, freight lifted, normalised freight delay. More info: ORR

12 March 2020. Thursday. Passenger rail usage Q3 2019/20 (October-December) published - Passenger train KM, Passenger KM, journeys, revenue. More info: ORR

May

21 May 2020. Thursday. Passenger rail performance Q4 2019/20 (January-March) published - PPM, CaSL, FDM. More info: ORR

28 May 2020. Thursday. Freight rail usage and performance Q4 2019/20 (January-March) published - freight moved, freight lifted, normalised freight delay. More info: ORR

June

4 June 2020. Thursday. Passenger rail usage Q4 2019/20 (January-March) published - Passenger train KM, Passenger KM, journeys, revenue. More info: ORR

July

Train Operating Company Key Statistics 2019-20. More info: TOCs

September

17 September 2020. Thursday. Passenger rail performance Q1 2020/21 (April-June) published - PPM, CaSL, FDM. More info: ORR

24 September 2020. Thursday. Freight rail usage and performance Q1 2020/21 (April-June) published - freight moved, freight lifted, normalised freight delay. More info: ORR

October

1 October 2020. Thursday. Passenger rail usage Q1 2020/21 (April-June) published - Passenger train KM, Passenger KM, journeys, revenue. More info: ORR

November

5 November 2020. Thursday. Rail Emissions 2019-20 published. More info: ORR

December

Estimates of station usage for 2019/20 published. More info: ORR

3 December 2020. Thursday. Passenger rail performance Q2 2020/21 (July-September) published - PPM, CaSL, FDM. More info: ORR

10 December 2020. Thursday. Passenger rail usage Q1 2020/21 (April-June) published - Passenger train KM, Passenger KM, journeys, revenue. More info: ORR

17 September 2020. Thursday. Freight rail usage and performance Q2 2020/21 (July-September) published - freight moved, freight lifted, normalised freight delay. More info: ORR

Route improvement works

Image Image
Major improvement works in 2020, but why do it at weekends and over bank holidays?
Mind how you go, or you'll NOT enjoy your 'trip': watch THIS!
~ 6 January 2018 onwards - Great North Rail Project works. Enjoy the highlights; buy the book.
~ 21 July 2018 onwards - station rebuild at Glasgow Queen Street (which marked its 177th birthday in February 2019) with changed entry and exit arrangements. Fit for a Queen Street, thanks to local artist. Demolition work complete. December 2018 Big lift! February 2019 sneak-peak! Then and now - with VIDEO. In April 2019, new platforms on track. Early-June rebranding of station as Glasgow 'Green' Street. Late-June confirmation of platform extensions open in July 2019. Services amended as platform extensions commissioned. Meanwhile, adding a touch of glass! Successful commissioning of platforms 2 and 3 - WATCH VIDEO, 4 and 5 will now follow from mid-September to mid-October. Step inside the redeveloped station. September 2019's First Glass finish. Two years' transformation at Queen Street - with VIDEO!
~ 14 December 2019-17 May 2020 - service suspensions and alterations on GTR Great Northern's Northern City Line.
~ 25/26 January-28/29 March - final phase of works, ongoing since 31 August 2019, to upgrade the Southend Victoria line resumes, continuing until 28/29 March with weekend services altered/suspended now to a revised programme.
~ 15-21 February - services suspended on Heart of Wessex line.
~ 15-23 February - services suspended between Colne and Blackburn and altered between Blackburn, Accrington and Burnley. You have just been given a REMINDER.
~ 15-23 February - services suspended on Bexleyheath line (Kidbrooke-Barnehurst) for major landslip prevention and other works. Use the new online travel advice tool.
~ 15-23 February - services suspended in Cornwall between Truro and Penzance for upgrade works, including between St. Erth and St. Ives until 20 February.
~ 17-23 February - services suspended on Norfolk's Wherry Lines for major signalling upgrade works. REMINDER.
~ 22/23 February - services suspended via Eastleigh for emergency works after freight train derailment.
~ 22/23 February - suspended and amended Midland Main Line weekend services south of Leicester.
~ 22/23 February, 29 February/1 March, 7/8, 14/15, 21/22, 28/29 March, 18/19 April - Great Eastern Main Line services suspended between Ingatestone and Newbury Park for major trackworks.
~ 22/23 February, 10-12 April - service suspensions at weekends between Cambridge and King's Lynn for platform extensions at Waterbeach and Littleport. Works begin early-October 2019.
~ 29 February/1 March - NO services to/from London King's Cross. A first REMINDER! No services between Biggleswade/Letchworth Garden City and London King's Cross. Just FORGET IT!
~ 29 February/1 March, - services suspended on Heart of Wessex line between Yeovil Pen Mill and Dorchester West for bridge replacement.
~ 1, 8 March - services suspended between Manchester Airport and Manchester Piccadilly.
~ 28/29 March - services suspended on Heart of Wessex line between Yeovil Pen Mill and Wymouth for track renewals.
~ 4/5, 11-13, 18/19, 25/26 April, 2-4, 9/10, 16/17, 23-25, 30/31 May, 6/7 June - services suspended between Carlisle and Glasgow/Edinburgh for major route improvement works.
~ 10-19 April - all lines in the Guildford area affected by improvement work.
~ 10-13 April, 2/3, 9/19, 23-25 May - service alterations and suspensions on West Coast Main Line for variety of route improvement works.
~ 20/21 June - NO services into/out of London King's Cross.
~ 5-13 September - reduced long-distance service on East Coast Main Line, including no long-distance services to/from London King’s Cross on Saturday 5/Sunday 6 September.
~ mid-December 2020 until late-March 2021 - significant periods of disruption for all services to/from London King’s Cross.

Various


December 2019


Image
31 December 2019. Final date for rail vehicles to comply with accessibility regulations. More info: ORR and DfT

2020


January

Image
28 January 2020. Tuesday. National Rail Passenger Survey, Autumn 2019 results published. More info: TF-NRPS

May


7 May 2020. Thursday. UK local elections. More info: Vote 2020

Image
17 May 2020. Sunday. National rail timetable change.
Image
17 May 2020. Sunday. Sunday services restored to Cooksbridge, East Sussex - a gateway to South Downs National Park.

December


Image
13 December 2020. Sunday. National rail timetable change.

2021


May


6 May 2021. Thursday. UK local elections.

Image
16 May 2021. Sunday. National rail timetable change.

September


Image
Start of extended services on Northern line to Battersea Power Station, via Kennington and Nine Elms. More info: NLE

December


Image
12 December 2021. Sunday. National rail timetable change.

Image
12 December 2021. Sunday. Services planned to start between Gospel Oak and Barking Riverside.

2022


May


5 May 2022. Thursday. UK General and local elections.

Image
15 May 2022. Sunday. National rail timetable change.

December


Image
11 December 2022. Sunday. National rail timetable change.

2023


May


4 May 2023. Thursday. UK local elections.

Image
21 May 2023. Sunday. National rail timetable change.

December


Image
10 December 2023. Sunday. National rail timetable change.

Image
10 December 2023. Sunday. East West Rail services due to start between Bedford and Oxford (and possibly Reading).

2024


April


Image
1 April 2024. Control Period 7 (2024-29) starts.

May


2 May 2024. Thursday. UK local elections.

Image
19 May 2024. Sunday. National rail timetable change.

December


Image
8 December 2024. Sunday. National rail timetable change.

Image
8 December 2024. Sunday. East West Rail services due to start between Milton Keynes and Oxford/Reading, and Milton Keynes and Aylesbury/London Marylebone.

2025


May


1 May 2025. Thursday. UK local elections.

Image
18 May 2025. Sunday. National rail timetable change.

December


Image
14 December 2025. Sunday. National rail timetable change.

2026


May


7 May 2026. Thursday. UK local elections.

Image
17 May 2026. Sunday. National rail timetable change.

December


Image
13 December 2026. Sunday. National rail timetable change.

2027


December


Image
16 May 2026. Sunday. National rail timetable change.

Image
12 December 2027. Sunday. National rail timetable change.

Image
12 December 2027. Sunday. East West Rail services due to start between Cambridge and Oxford.

2028


Image
21 May 2028. Sunday. National rail timetable change.

Image
10 December 2028. Sunday. National rail timetable change.

2029


April


Image
1 April 2029. Control Period 8 (2029-34) starts.